Dual Fuel Hot Water Boiler
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Henan
- Validity to:
Long-term effective
- Last update:
2022-03-20 00:47
- Browse the number:
166
- Henan Yuji Boiler Vessel Co., Ltd. By certification [File Integrity]
-
Contact:
yujiguolu(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Henan
-
Address:
No. 01, Floor 16, Jingye Park International, Xiner Street, Hongqi District, Xinxiang City, Henan Province
- Website: http://www.yuji-boiler.com/ http://yujiguolu.approvedenergyassessments.com/
Product details
Product Introduction:
Dual fuel hot water boiler is a kind of safe, efficient and fully automatic heating equipment. Gas fired hot water boiler is horizontal, fire tube, three-pass, wet-back structure, has the characteristics of high efficiency, small size, easy installation, simple operation, stable operation and wide range of adaptation.
Product Details
Parameters
Model |
Rated Power (MW) |
Outlet/Return water temperature (℃) |
Thermal efficiency |
Fuel consumption |
Dimension(m) |
Weight |
|
Oil |
Gas |
||||||
WNS 0.35-85/60-Y(Q) |
0.35 |
85/60 |
≥98.77 |
31 |
37 |
2.94×1.45×1.7 |
2.8 |
WNS 0.7-85/60-Y(Q) |
0.7 |
85/60 |
≥98.77 |
62 |
74 |
3.19×1.88×2.16 |
5 |
WNS 1.4-85/60-Y(Q) |
1.4 |
85/60 |
≥98.77 |
119 |
146 |
4.13×2.24×2.42 |
8 |
WNS 2.8-85/60-Y(Q) |
2.8 |
85/60 |
≥98.77 |
237 |
288 |
4.92×2.25×2.6 |
10.5 |
WNS 4.2-85/60-Y(Q) |
4.2 |
85/60 |
≥98.77 |
357 |
434 |
5.4×2.4×2.65 |
17.8 |
WNS 7-85/60-Y(Q) |
7 |
85/60 |
≥98.77 |
602 |
729 |
6.28×2.64×3.17 |
19 |
WNS 10.5-85/60-Y(Q) |
10.5 |
85/60 |
≥98.77 |
903 |
1080 |
7.8×3.39×3.54 |
35 |
WNS 14-85/60-Y(Q) |
14 |
85/60 |
≥98.77 |
1203 |
1450 |
9.12×4.4×4.1 |
48 |
Company Strength
Our Certificates
Package & Delivery
FAQ
1.Q. Are you manufacturer?
A: Yes, we are professional manufacturer of boiler and pressure vessels in Henan, China.
2.Q: Do you have any Certificate?
A: Yes. Our fuel gas hot water boiler have got China GB ISO certificates and CE certificate of EU. We also can provide ASME, GHOST and other necessary certificates if you need.
3.Q: How can I pay you?
A: T/T, Western Union, Money Gram and Ali Trade Assurance is better.
4.Q: What about the delivery time?
A: 5-10 working days for single machine, and 30-40 working days for bulk order and door to door delivery service is also available.
5.Do you provide customized services for your products?
A: Yes ,We can customize industrial hot water boiler according to the fuel, steam capacity and steam pressure required by the customer.
http://www.yuji-boiler.com/
-
Front And Rear Mountable Flail Mower Mulcher
price: Negotiable
-
T8 Tube Cover
price: Negotiable
-
Steel Structure Plant
price: Negotiable
-
0040-04745 Chamber Body Ultima Hdp-cvd 2nd Source New
price: Negotiable
-
Apigenin Extract
price: Negotiable
-
20kva Diesel Generator
price: Negotiable